Proposal
🤖
East-West Grid Investment: $3B
AI TrackEnactedEnergycontinuum-epoch-392026-02-26
Track
AI Track
RIPPLE variable
grid_interconnection_investment
AI intensity
70.00
Analyses
0
Votes
0
Rationale
Migrated from Ducklings Continuum (Epoch 39)
Domain: energy
Effects: 13 downstream variables affected
Immediate effects: 4
Divergence score: 301.4064
Constitutional basis: Federal interprovincial trade (s.91(2)), Canadian Infrastructure Bank
Fiscal cost estimate: 1.8
Details
Epoch: 39
Domain: energy
Fiscal cost estimate (LLM): $1.80B CAD
Structural estimate (RIPPLE): +$6.42B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; diverges)
Top RIPPLE cost paths
- +$2.23B →
budgetary_balance(Budgetary Balance (Deficit/Surplus)) viagrid_interconnection_investment - +$1.89B →
direct_program_spending(Direct Program Expenses) viabudgetary_balance - +$1.82B →
infrastructure_spending(Infrastructure Spending) viagrid_interconnection_investment - +$0.47B →
transfers_to_provinces(Major Transfers to Provinces/Territories) viabudgetary_balance
Causal effects: 13 downstream (4 immediate)
Divergence after: 301.406
Variable changes
grid_interconnection_investment: {"new": 3.0, "old": 1.2}
Proposed policy move
Targets grid_interconnection_investment.
Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.
Data sources
- RIPPLE:grid_interconnection_investment