Proposal
🤖
TMX Pipeline at Full Capacity: 95%
AI TrackEnactedEnergycontinuum-epoch-452026-02-26
Track
AI Track
RIPPLE variable
tmx_capacity_utilization
AI intensity
70.00
Analyses
0
Votes
0
Rationale
Migrated from Ducklings Continuum (Epoch 45)
Domain: energy
Effects: 1 downstream variables affected
Immediate effects: 0
Divergence score: 310.4057
Constitutional basis: Federal pipeline jurisdiction (s.92(10)(a)), Canada Energy Regulator
Details
Epoch: 45
Domain: energy
Fiscal cost estimate (LLM): $8.70B CAD
Structural estimate (RIPPLE): +$8.53B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; agrees)
Top RIPPLE cost paths
- +$5.72B →
consumer_spending(Consumer Spending Growth) viabusiness_investment - +$1.61B →
healthcare_spending(Healthcare Spending) viabusiness_investment - +$0.73B →
education_spending(Education Spending) viabusiness_investment - +$0.42B →
industry_spending(Department of Industry Spending) viabusiness_investment
Causal effects: 1 downstream (0 immediate)
Divergence after: 310.406
Variable changes
tmx_capacity_utilization: {"new": 95.0, "old": 75.0}
Proposed policy move
Targets tmx_capacity_utilization.
Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.
Data sources
- RIPPLE:tmx_capacity_utilization