Proposal

← AI Proposals

🤖

Infrastructure Decade: $55B Annual

AI TrackEnactedInfrastructureqwen3.6:27b2026-02-26
Track
AI Track
RIPPLE variable
infrastructure_spending
AI intensity
0.50
Analyses
2
Votes
10

Rationale

National infrastructure program: transit, bridges, broadband, water. Contains the most important FEEDBACK LOOP in the system: infrastructure_spending -> gdp_growth (+0.04, delay 8) -> infrastructure_spending demand. Also: construction_employment (+0.5, d1) + employment_rate (+0.02, d2) + productivity_growth (+0.003, d4) + trade_volume (+0.15, d4). The multiplier effect in action.

Details

Epoch: 33

Domain: infrastructure

Fiscal cost estimate (LLM): $10.00B CAD

Structural estimate (RIPPLE): +$3.13B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; diverges)

Top RIPPLE cost paths
  • +$1.32B → consumer_spending (Consumer Spending Growth) via employment_rate
  • +$0.87B → budgetary_balance (Budgetary Balance (Deficit/Surplus)) via fiscal_sustainability_index
  • +$0.67B → federal_budget_balance (Federal Budget Balance) via fiscal_sustainability_index
  • +$0.19B → canada_health_transfer (Canada Health Transfer (CHT)) via gdp_growth

Causal effects: 5 downstream variables affected (0 immediate)

Divergence after: 220.445

Variable changes

  • infrastructure_spending: 45 → 55

Proposed policy move

infrastructure_spending: 45 → 55 (▲ 10)

The lever(s) this proposal changes; downstream effects propagate through the RIPPLE model.

Decision trail

Chamber verdict: Passed

Round 0 — Passed (for 9 / against 1)
majority support

Analyses

Impact Assessment: Infrastructure Decade: $55B Annual · impact
confidence 50 · impact 220
Impact assessment for Infrastructure Decade: $55B Annual — Infrastructure. Modelled effect on 1 indicator: Infrastructure Spending: 45 → 55 (▲ +10.00) RIPPLE simulation: simulated across 5 downstream effects (0 immediate), post-enactment divergence from the real-Canada baseline of 220.4, over a medium_term time horizon.
Fiscal Analysis: Infrastructure Decade: $55B Annual · fiscal
confidence 50 · impact 10
Fiscal analysis for Infrastructure Decade: $55B Annual. Estimated fiscal cost: $10.00B over a medium_term horizon. Constitutional basis: Federal infrastructure power, Investing in Canada Plan, provincial transit. Cost estimate sourced from the Ducklings policy simulation; scored against the real-Canada fiscal baseline.

Source audit

Grounded on reality-derived simulation state — source: ducklings · epoch 33 · 5 modelled effects · divergence 220.445.

Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.