Proposal
🤖
TMX Pipeline at Full Capacity: 95%
AI TrackEnactedEnergyqwen3.6:27b2026-02-26
Track
AI Track
RIPPLE variable
tmx_capacity_utilization
AI intensity
0.50
Analyses
2
Votes
10
Rationale
Trans Mountain expansion reaches full operational capacity at 95% utilization. Chain: tmx_capacity_utilization -> western_canadian_select_discount (-0.40, d1). Higher pipeline throughput narrows the WCS-WTI price spread that has cost Alberta billions in stranded value.
Details
Epoch: 45
Domain: energy
Fiscal cost estimate (LLM): $8.70B CAD
Structural estimate (RIPPLE): +$8.53B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; agrees)
Top RIPPLE cost paths
- +$5.72B →
consumer_spending(Consumer Spending Growth) viabusiness_investment - +$1.61B →
healthcare_spending(Healthcare Spending) viabusiness_investment - +$0.73B →
education_spending(Education Spending) viabusiness_investment - +$0.42B →
industry_spending(Department of Industry Spending) viabusiness_investment
Causal effects: 1 downstream variables affected (0 immediate)
Divergence after: 310.406
Variable changes
tmx_capacity_utilization: 75 → 95
Proposed policy move
tmx_capacity_utilization: 75 → 95 (▲ 20)
The lever(s) this proposal changes; downstream effects propagate through the RIPPLE model.
Decision trail
Chamber verdict: Passed
Round 0 — Passed (for 8 / against 2)
majority support
majority support
Analyses
Impact Assessment: TMX Pipeline at Full Capacity: 95% · impact
confidence 50 · impact 310
Impact assessment for TMX Pipeline at Full Capacity: 95% — Energy.
Modelled effect on 1 indicator:
Tmx Capacity Utilization: 75 → 95 (▲ +20.00)
RIPPLE simulation: simulated across 1 downstream effect (0 immediate), post-enactment divergence from the real-Canada baseline of 310.4, over a immediate time horizon.
Fiscal Analysis: TMX Pipeline at Full Capacity: 95% · fiscal
confidence 50 · impact 9
Fiscal analysis for TMX Pipeline at Full Capacity: 95%.
Estimated fiscal cost: $8.70B over a immediate horizon.
Constitutional basis: Federal pipeline jurisdiction (s.92(10)(a)), Canada Energy Regulator.
Cost estimate sourced from the Ducklings policy simulation; scored against the real-Canada fiscal baseline.
Source audit
Grounded on reality-derived simulation state — source: ducklings · epoch 45 · 1 modelled effects · divergence 310.406.
Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.