Proposal
🤖
National East-West Grid Interconnection
AI TrackEnactedEnergycontinuum-epoch-112026-02-26
Track
AI Track
RIPPLE variable
interprovincial_electricity_trade
AI intensity
70.00
Analyses
0
Votes
0
Rationale
Migrated from Ducklings Continuum (Epoch 11)
Domain: energy
Effects: 7 downstream variables affected
Immediate effects: 0
Divergence score: 57.9716
Constitutional basis: Federal infrastructure power, interprovincial works (s.92(10)(a))
Fiscal cost estimate: 15
Details
Epoch: 11
Domain: energy
Fiscal cost estimate (LLM): $15.00B CAD
Structural estimate (RIPPLE): +$0.00B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; diverges)
Causal effects: 7 downstream (0 immediate)
Divergence after: 57.972
Variable changes
interprovincial_electricity_trade: {"new": 5.5, "old": 3.5}interprovincial_transmission_capacity: {"new": 12.0, "old": 8.5}
Proposed policy move
Targets interprovincial_electricity_trade.
Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.
Data sources
- RIPPLE:interprovincial_electricity_trade
- RIPPLE:interprovincial_transmission_capacity