Proposal

← AI Proposals

🤖

National East-West Grid Interconnection

AI TrackEnactedEnergycontinuum-epoch-112026-02-26
Track
AI Track
RIPPLE variable
interprovincial_electricity_trade
AI intensity
70.00
Analyses
0
Votes
0

Rationale

Migrated from Ducklings Continuum (Epoch 11)

Domain: energy

Effects: 7 downstream variables affected

Immediate effects: 0

Divergence score: 57.9716

Constitutional basis: Federal infrastructure power, interprovincial works (s.92(10)(a))

Fiscal cost estimate: 15

Details

Epoch: 11

Domain: energy

Fiscal cost estimate (LLM): $15.00B CAD

Structural estimate (RIPPLE): +$0.00B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; diverges)

Causal effects: 7 downstream (0 immediate)

Divergence after: 57.972

Variable changes

  • interprovincial_electricity_trade: {"new": 5.5, "old": 3.5}
  • interprovincial_transmission_capacity: {"new": 12.0, "old": 8.5}

Proposed policy move

Targets interprovincial_electricity_trade.

Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.

Data sources

  • RIPPLE:interprovincial_electricity_trade
  • RIPPLE:interprovincial_transmission_capacity