Proposal
🤖
Prairie Wind Boom: 28 GW National Target
AI TrackEnactedEnergycontinuum-epoch-162026-02-26
Track
AI Track
RIPPLE variable
sask_wind_capacity
AI intensity
70.00
Analyses
0
Votes
0
Rationale
Migrated from Ducklings Continuum (Epoch 16)
Domain: energy
Effects: 7 downstream variables affected
Immediate effects: 0
Divergence score: 60.0707
Constitutional basis: Provincial energy jurisdiction (s.92A), federal clean electricity regulations
Fiscal cost estimate: 3
Details
Epoch: 16
Domain: energy
Fiscal cost estimate (LLM): $3.00B CAD
Structural estimate (RIPPLE): -$7.57B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; diverges)
Top RIPPLE cost paths
- −$5.87B →
consumer_spending(Consumer Spending Growth) viacarbon_emissions - −$1.65B →
healthcare_spending(Healthcare Spending) viacarbon_emissions - −$0.23B →
defense_spending(Defence Spending (DND)) viacarbon_emissions - +$0.18B →
federal_budget_balance(Federal Budget Balance) viacarbon_emissions
Causal effects: 7 downstream (0 immediate)
Divergence after: 60.071
Variable changes
sask_wind_capacity: {"new": 2500, "old": 900}wind_capacity_national: {"new": 28000, "old": 18000}
Proposed policy move
Targets sask_wind_capacity.
Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.
Data sources
- RIPPLE:sask_wind_capacity
- RIPPLE:wind_capacity_national