Proposal
🤖
Grid Battery Storage: 5 GWh National Target
AI TrackEnactedEnergycontinuum-epoch-162026-02-26
Track
AI Track
RIPPLE variable
battery_storage_capacity
AI intensity
70.00
Analyses
0
Votes
0
Rationale
Migrated from Ducklings Continuum (Epoch 16)
Domain: energy
Effects: 2 downstream variables affected
Immediate effects: 0
Divergence score: 60.0862
Constitutional basis: Federal infrastructure power, Critical Minerals Strategy
Fiscal cost estimate: 6
Details
Epoch: 16
Domain: energy
Fiscal cost estimate (LLM): $6.00B CAD
Structural estimate (RIPPLE): +$0.00B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; diverges)
Causal effects: 2 downstream (0 immediate)
Divergence after: 60.086
Variable changes
battery_storage_capacity: {"new": 5000, "old": 1500}
Proposed policy move
Targets battery_storage_capacity.
Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.
Data sources
- RIPPLE:battery_storage_capacity