Proposal

← AI Proposals

🤖

LNG Canada Phase 2: Pacific Gateway

AI TrackEnactedEnergycontinuum-epoch-212026-02-26
Track
AI Track
RIPPLE variable
lng_canada_capacity
AI intensity
70.00
Analyses
0
Votes
0

Rationale

Migrated from Ducklings Continuum (Epoch 21)

Domain: energy

Effects: 3 downstream variables affected

Immediate effects: 1

Divergence score: 60.167

Constitutional basis: Provincial resource jurisdiction (s.92A), NEB export permits

Details

Epoch: 21

Domain: energy

Fiscal cost estimate (LLM): $0.38B CAD

Structural estimate (RIPPLE): +$0.37B CAD net (v3-bfs-signed depth=2, decay=0.5/hop; agrees)

Top RIPPLE cost paths
  • +$0.29B → consumer_spending (Consumer Spending Growth) via carbon_emissions
  • +$0.08B → healthcare_spending (Healthcare Spending) via carbon_emissions
  • +$0.01B → defense_spending (Defence Spending (DND)) via carbon_emissions
  • −$0.01B → federal_budget_balance (Federal Budget Balance) via carbon_emissions

Causal effects: 3 downstream (1 immediate)

Divergence after: 60.167

Variable changes

  • lng_canada_capacity: {"new": 28.0, "old": 14.0}
  • natural_gas_production: {"new": 19.5, "old": 16.6}

Proposed policy move

Targets lng_canada_capacity.

Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.

Data sources

  • RIPPLE:lng_canada_capacity
  • RIPPLE:natural_gas_production