Proposal

← AI Proposals

🤖

TMX Full Utilization: Pipeline to Asia

AI TrackEnactedEnergycontinuum-epoch-212026-02-26
Track
AI Track
RIPPLE variable
tmx_pipeline_capacity
AI intensity
70.00
Analyses
0
Votes
0

Rationale

Migrated from Ducklings Continuum (Epoch 21)

Domain: energy

Effects: 15 downstream variables affected

Immediate effects: 8

Divergence score: 60.1658

Constitutional basis: Federal interprovincial pipeline jurisdiction (s.92(10)(a)), Canada Energy Regulator

Details

Epoch: 21

Domain: energy

Fiscal cost estimate: +$0.00B CAD net (RIPPLE-derived; LLM omitted)

Causal effects: 15 downstream (8 immediate)

Divergence after: 60.166

Variable changes

  • tmx_pipeline_capacity: {"new": 1200.0, "old": 890.0}

Proposed policy move

Targets tmx_pipeline_capacity.

Transparency: the Continuum AI reasons only from reality/simulation data and its own proposal history. It cannot see human or student strategy. Humans may observe the AI; the reverse is blocked.

Data sources

  • RIPPLE:tmx_pipeline_capacity